100% Compliance Guaranteed

OGC INDUSTRY BULLETIN 2020-03: Changes in Requirements for Pipeline Notice of Intent (NOI) Submissions

EFFECTIVE DATE: Immediately (Jan. 10, 2020)

 

The BC Oil and Gas Commission (Commission) has made changes to pipeline Notice of Intent (NOI) submission requirements to increase oversight of pipeline integrity. The changes include enhancements to the NOI Repair or Replace Pipeline (in-kind) and addition of a new NOI for Integrity Activities.

 

Changes to the NOI Repair or Replace Pipeline (in-kind) include:

– enhanced documentation requirements,

– requirement to submit an NOI for repairs of pipeline installations, and

– requirement to submit an NOI for the installation of repair sleeves. Submission of the NOI for a repair sleeve is not required prior to installation.  

 

The new NOI Integrity Activities is required for:

– inline inspection of pipelines for the purposes of integrity condition assessment, and – integrity dig programs.

 

Notification prior to commencement of Integrity Activities is not required. Results are to be submitted 30 days after completion of the annual program. One NOI should be submitted for each Pipeline Project Number.

 

Detailed submission requirements for Pipeline NOIs are outlined in section 11.5 of the Oil and Gas Activity Operations Manual.

 

If you have any questions regarding this Industry Bulletin, please contact: 

 

Shani Steinhubl

Senior Engineer, Integrity

BC Oil and Gas Commission

Shani.Steinhubl@bcogc.ca

250-980-6087